1987 - 1988
For sub 2, 3, 5 ilir, and 13, 14 ulu. KIP development of this form include:
Environmental road (asphalt), Ris Concrete Construction, Construction of concrete bridges, drinking water faucets, toilets, tub waste, Waste Carts, Concrete Buis, SD Multi, Community Health Center.
1981
The rebuilding of the burned area kampong 22, 23, 24 and 26 ilir denagn site area building area of 236,078 m2 with house flat 4th floor, various types of as many as 3584 units complete with infrastructure and environmental facilities and 214 plots of land ready to build.
Land Acquisition
For the removal of the terminal plans under Seberang Ilir Ampera bridge across the pit to the region for both passenger terminals and fatherly stuff  ± 8 Ha.
- Construction of city parks.
- Road construction with Ring and Radial system according to Map 1930.
- Improved hygiene with Stabilization Program PALEMBANG CITY Bari.
- Length of Road in the city = 282 290 km, consists of:
- Arterial Roads = 61 220 km
- Secondary Arterial Roads = 58 752 km
- Collectors and local roads = 162 418 km
Addition and Ring Opening and Radial
- Soak Bato Road to the Road Radial Arivai captain.
- Environment II road from Jl. Lt. Col. Alexander Road translucent to Segaran.
- Circle Radial Road from I through to Jalan Veteran.
- Outer Circle Road from Gandus Into Tiger Protection, Jl. Demat leaf width.
The number of existing bridges in the city of Palembang were 116 pieces, consisting of:
- 80 pieces of concrete bridges
- Iron Bridge 7 pieces
- 29 pieces of timber bridges
Settlements Kenten Sako, Polygon and flats.
Drainage
Since 1980 - 1987 333 671 km along the channel is built, scattered out of the way Captain A. Rivai towards the Musi River and Region Seberang Ulu.
1987 - 1988 built the city drainage project along the 7740 km to the location in the District of West Ilir Ilir Timur I and I.
1988 South Sumatra designated as the Regional Tourist Destination - 17. The city became the provincial capital of Palembang as the Main Areas targeted by tourism development. Sights you'll enjoy the water attractions and culture.
1990 - 1999
- Construction of Hospital and the Road to Go to Hospital
- Road Keramasan - Musi II - Tiger Protection
- Musi Bridge II
- Jalan Mas Krebet
- Jalan Kebun Bunga
- Translucent Jalan Sudirman to Sako
- Archaeological Park of Sriwijaya
- Reclamation Seberang Ulu I
- Road to Tanjung Api-api
- The pass Jalan Jend. A. Yani to Hamlet Rambuatan
- South Ring Road
- Gandus road to the highway Palembang - Betung
- Jalan Musi II to the garbage disposal Village Keramasan
- Translucent road to Jalan Jalan Tiger Protection pilgrimage Burlian
- Development Cemetery Garden Flowers (Silk Air)
- Construction of Retaining Wall front Fortress Religious Tourism
No comments:
Post a Comment