Recent Articles

History of Palembang (Part 8)

Systems Development Macro and Micro Systems

Macro System: includes the main channel by making use of rivers and ponds (Retention Basin).

Micro System: Includes the collecting ducts from these areas flow into the main channels and kesaluran parent.

Implementation Phase:
  •     The program urges
        Cleaning the river weir and the River rendang.
        Creation / improvement of primary channels, siring siring-and-Koker Koker.
  •     Short Term Program
        Normalization Sekanak River, a river dam
        Enhancement / creation of primary channels and secondary channels between the two rivers.

  •     Medium Term Program
        The design and implementation details in the circle II
        Normalization of rivers, improvement / manufacturing channels of primary and secondary.
  •     Long-term
        Advanced Study and design of drainage systems in keselurahan.
        Improvement and normalization of the river rendang.
        Survey design rivers in the area Seberang Ilir.
        Bayas creek rehabilitation.
        Kampung Improvement Program (Kampong improvment Program).

1979 - 1980

To Kampung 9,10,11,13,14 ilir and an ulu, with a total area of ​​40 ha to 30 210 residents of the soul. 1981 - 1982

To Kampong ulu 1.2, 13.14, 19, 22, 26, 26, 27 and 28 ilir, with a total area of ​​80 ha to 41 654 residents of the soul.

1982 - 1983

To Kampung ilir 8,9,10,11,24,26,29,30 and 32, with a total area of ​​125 ha to 75 358 residents of the soul.

1983 - 1984

Proposed for the Village 35 ilir, 3, 4, 5, 7 ulu, and Ogan Kertapati new with area 75 ha to 99 126 residents of the soul.

In the realization kampung improvement done on the sub 29, 30, 32, 35 ilir, 3 / 4, 5.7 and 8 solar plexus.

1984 - 1985

To Kelurahan 3 / 4, 5,7,11,12 ulu, and Ogan Kertapati New.

1986 - 1987

For the last coral village, 36, 35, 32 ilir, 8, 11, 12, 13, 14 ulu, and Ladder Takat.